Visual Takeoff Overview

Review what SiteRep found on the drawings, correct it, and approve your takeoff.

What this is

Takeoff answers one question: how much? In SiteRep you do it on the drawing itself — no measuring somewhere else and re-typing quantities.

What you're trying to do

Pick a scope, review proposed items on each sheet, fix what's wrong, and approve the takeoff.

Before you start

  • Current drawings are uploaded in Documents.

Step by step

  1. 1Open Takeoff and add the scope you're estimating, for example Framing & Drywall.Look for Add a scope
  2. 2Pick the drawing and sheet. The sheet opens in the viewer.Look for Sheet
  3. 3Click Review current set. Adam goes through every current sheet for the scope; you can also ask him to find it on one sheet.Look for Review current set
  4. 4Accept, adjust, remove or add items until the sheet matches what you'd take off.Look for Takeoff review queue
  5. 5Approve the accepted items. They join the takeoff register as approved quantities.Look for Approve

What success looks like

Approved items show in the takeoff register as Visual takeoff, with the sheet, document issue and who approved them. Assembly shows not assigned until the next step.

If you get stuck

Adam found nothing on a sheet.

The sheet shows No items proposed — confirm. Check it yourself, add anything missed, then mark it reviewed or exclude it. It is never treated as zero scope on its own.

My takeoff doesn't show up in Assemblies.

Only approved takeoffs appear there. Approve it first.

What SiteRep does and does not do

Adam prepares and explains. Only you accept, adjust, remove or approve takeoff — nothing becomes approved takeoff on its own, and SiteRep never changes an approved quantity.