Walkthrough · 2 min
Review Linear Takeoff
Check proposed runs and their LF.
What this is
A proposed run shows the line traced on the drawing and how its LF was added up.
What you're trying to do
Accept runs you agree with and fix the rest.
Before you start
- The sheet has a confirmed scale.
Step by step
- 1Click the run. It lights up on the drawing.Look for Takeoff review queue
- 2RLook for e
- 3Adjust to move an endpoint, add a missed point, or remove one. The LF updates from the scale.Look for Adjust
- 4Accept it.Look for Accept
What success looks like
The run's total LF matches the drawing, with each segment shown.
If you get stuck
It says Needs scale.
Set the sheet's scale first.
What SiteRep does and does not do
Adam prepares and explains. Only you accept, adjust, remove or approve takeoff — nothing becomes approved takeoff on its own, and SiteRep never changes an approved quantity.
Next
Still stuck?
Updated 2026-10-09